Future Trails Component Parkway/Trail |
Description: A short 0.25 mile trail system that will occupy a landscaped corridor beneath overhead utility lines. The trail will align with a
planned parkway along Component Drive. The combined projects will link the Component Light Rail Station with the Lower Guadalupe River Trail
via a future ramp system leading to the trail. (The trail alignment is shown by the green dotted line, the parkway is shown by the orange dotted line).
Project proposed as part of the North San Jose Design Guideline document.

